
Our own solid surface — seamless, no grout, nothing to reseal. Installed in as little as one day.
A designer will call you within one business hour during Mon–Sat 8am–7pm. Sooner? Call (786) 675-7475.


Drag to compare
Same footprint, same window, same door. The tub and sliding doors came out; a frameless corner shower with seamless walls went in.
02
Full Bathroom Remodels
Down to the studs and back. One crew, one contract, one completion date.
From $18,500
→
03
Walk-In Tubs & Accessibility
Low-threshold entry, built-in seating, grab bars. Stay in the home you love.
From $11,500
→
04
Tub-to-Shower Conversion
Reclaim the tub nobody uses. Most are finished in two to three days.
From $7,400
→
05
Bathtub Replacement
A freestanding soaker in place of a builder tub. Same footprint, new room.
From $6,500
→
06
Vanities, Tile & Lighting
Floating cabinetry, backlit mirrors, designer fixtures. The hotel details.
From $4,200
→
Real ranges, up front, so you can decide if we're worth an hour of your Saturday. Your exact number comes in writing before anything is ordered.
A designer measures, shows you real material samples and listens to what you hate about the room. About an hour.
One number, in writing, before anything is ordered. No allowances that balloon later.
Our crew, your completion date in the contract, and the last payment only after you sign off on the walkthrough.
One crew standard across Central and South Florida. Don't see your city? Call us — we probably cover it.
Miami, Miami Beach, Coral Gables, Aventura +8 more
Fort Lauderdale, Hollywood, Pembroke Pines, Weston +8 more
West Palm Beach, Boca Raton, Delray Beach, Boynton Beach +8 more
Naples, Fort Myers, Cape Coral, Bonita Springs +4 more
Orlando, Winter Park, Kissimmee, Lake Mary +8 more
Tampa, St. Petersburg, Clearwater, Brandon +6 more
Because we are not waiting on anybody. We own our own line of bathroom remodeling materials and keep it stocked in our warehouse, so there is no supplier lead time, no backorder and no discontinued tile three weeks into your job. Our own crew arrives with everything already loaded. Larger or custom projects still take longer, and we will tell you which one yours is before you sign anything.
Yes, and this is where most contractors fall apart in Florida. We prepare the association package, carry the certificates of insurance your building requires, coordinate the riser shutoff with management, and work inside your building's approved work hours and elevator schedule. High-rise and condo work is a core part of what we do.
Solid surface is a non-porous mineral-and-resin material — the same category as a high-end kitchen countertop, made into shower walls. It is seamless, so there is no grout. It is solid all the way through, so unlike acrylic it does not flex, and a scratch or scuff sands out instead of becoming permanent. It is warm to the touch rather than cold like tile.
Our workmanship is covered by a lifetime warranty: if something we installed fails because of how we installed it, we come back and fix it. It does not cover damage from accidents, misuse or work done by others. The exact terms are written into your contract, so you know what is covered before you sign.
A designer comes to your home, measures the space, listens to what is bothering you about the current bathroom, shows you real tile and fixture samples, and leaves you with a fixed written price. It takes about an hour. There is no obligation and nobody will sit at your kitchen table pressuring you to sign that night.
Book a free in-home design consultation. We measure, show you samples, and leave you with a fixed written price — usually in about an hour.
We'll email you the details along with our Florida remodel cost guide.
No spam, no high-pressure calls. Unsubscribe any time.